您好,欢迎光临莱州聚峰机械有限公司网站! 郑重声明 进入官网

如何操作中科自上料水泥搅拌车?

来源:http://www.sdzkjf.cn/ 日期:2020-06-12 发布人:admin
  1.检查中科自上料水泥搅拌车是否顺畅,四条腿是否支撑牢固;
  1. Check whether the concrete mixer of Zhongke is smooth and whether the four legs are firmly supported;
  2. 机器空载运行是否正常;
  2. Whether the machine operates normally without load;
  3.将泵注满水并测试一次;
  3. Fill the pump with water and test once;
  4. 检查电器接地情况。
  4. Check the electrical grounding.
  二是自上料水泥搅拌车的使用要求
  Second, the use requirements of concrete mixer
水泥自动搅拌车
  1.每次添加的搅拌料不得超过规定的值,料斗只有在搅拌出后才能提起进料;
  1. The mixing material added each time shall not exceed the specified value, and the hopper can only lift the feed after mixing out;
  2.搅拌缸反转时,切勿拉操作手柄;
  2. When the mixing cylinder is reversed, do not pull the operating handle;
  3.为减少粘罐现象,进料斗的顺序为石头-水泥-沙子或沙子-水泥-石头;
  3. In order to reduce tank sticking, the order of feeding hopper is stone cement sand or sand cement stone;
  4.搅拌桶进料时及时加水,缩短搅拌时间,减少粉尘飞扬;
  4. Add water in time when feeding the mixing barrel to shorten the mixing time and reduce dust flying;
  5.料斗抬起后,任何人不得停留或从料斗下通过;当必须在料斗下进行维修时,应先用安全链将料斗紧固,才能进行维修。
  5. After the hopper is lifted, no one is allowed to stay or pass under the hopper; when maintenance must be carried out under the hopper, the hopper shall be fastened with safety chain before maintenance.
  6.严禁非工作人员随意拉动控制手柄;机器不运转时,必须用安全钩固定;
  6. It is strictly prohibited for non staff to pull the control handle at will; when the machine is not running, it must be fixed with a safety hook;
  7、注意电气安全,经常检查地面是否良好,防止电机受潮,防止损坏电气元件、电线;
  7. Pay attention to electrical safety, check whether the ground is in good condition, prevent the motor from getting damp, and prevent damage to electrical components and wires;
  8.当断电时,可以用曲柄摇动减速带盘,将物料从气缸中取出;
  8. When the power is cut off, the crank can be used to shake the reduction belt plate to take out the material from the cylinder;
  9.当机器停放时,必须放下四个支撑脚来支撑机器的重量;
  9. When the machine is parked, four supporting feet must be put down to support the weight of the machine;
  3自上料水泥搅拌车的完成要求
  3 requirements for completion of concrete mixer
  1.停机前,应加入一定量的石子和水,搅拌5-10分钟后释放,以消除缸内堆积,避免粘罐;
  1. Before shutdown, a certain amount of stones and water shall be added and released after mixing for 5-10 minutes to eliminate accumulation in the cylinder and avoid tank sticking;
  2. 清洁有灰堆积和粘着的混凝土;
  2. Clean the concrete with ash accumulation and adhesion;
  3.将料斗置于输送位置,悬挂安全链;所述控制手柄由安全钩固定;
  3. Place the hopper in the conveying position and hang the safety chain; the control handle is fixed by the safety hook;
  4. 切断电源,锁好电箱;
  4. Cut off the power supply and lock the electric box;
  5. 在严寒季节,将供水系统的水全部排干;
  5. In the severe cold season, drain all the water in the water supply system;
  6. 向每个润滑点添加必要的润滑油。
  6. Add necessary lubricating oil to each lubricating point.
  以上是水泥自动搅拌车厂家小编为大家介绍的相关内容,想要了解更多内容,欢迎访问网站:http://www.sdzkjf.cn
  The above is the relevant content introduced to you by China Science and technology concrete mixer manufacturer. To learn more, please visit the website: http://www.sdzkjf.cn

上一篇:水泥自动搅拌车夜间行车操作应该注意什么?
下一篇:自上料水泥搅拌车常用的三种类型的历史