自上料水泥搅拌车计量系统的维护事项

来源:http://www.sdzkjf.cn/ 日期:2022-05-23 发布人:admin
应做好设备的日常检查,检查主自上料水泥搅拌车油泵的相关情况,确认是否需要添加润滑脂。所有润滑点均应按制造商的设计要求进行润滑;主要润滑点有:卸料门轴、储料斗和称重斗轴、压辊和皮带输送机托辊、轴承和托辊、传动链、大齿轮等。
The daily inspection of the equipment shall be carried out to check the relevant conditions of the manual (self) oil pump of the main self-contained cement mixer and confirm whether it is necessary to add grease. All lubrication points shall be lubricated according to the design requirements of the manufacturer; The main lubrication points include: unloading gate shaft, storage hopper and weighing bucket shaft, pressure roller and belt conveyor idler, bearing and idler, transmission chain, big gear, etc.
每天检查设备的工作情况,打开储气罐底部的排水阀,将里面的水排掉。检查气压是否符合制造商的设计要求。检查电气接触器,确认继电器上的静、动触点是否完好,必要时拆下更换。检查自装式水泥搅拌机主机皮带的张紧和磨损情况,保证主机正常运转。
Check the working condition of the equipment every day, open the drain valve at the bottom of the air tank and drain the water inside. Check whether the air pressure meets the manufacturer's design requirements. Check the electrical contactor, confirm whether the static and dynamic contacts on the relay are intact, and remove and replace them if necessary. Check the tension and wear of the belt of the main machine of the self-contained cement mixer to ensure the normal operation of the main machine.
自上料水泥搅拌车
水泥搅拌机厂家认为,需要对搅拌臂、叶片、刮板等易磨损件和备件进行检查,并根据检查结果进行必要的间隙调整。磨损严重时,及时更换。检查振动器上的连接螺栓是否松动,必要时拧紧。还有很多。
The manufacturer of self-contained cement mixer believes that it is necessary to check the easily worn parts and spare parts such as mixing arm, blade and scraper, and make necessary gap adjustment according to the inspection results. In case of serious wear, replace it in time. Check whether the connecting bolts on the vibrator are loose and tighten them if necessary. There are still a lot of it.
水泥搅拌车所有设备安装完毕,连接电气控制系统,并经业主及供应商相关人员验收合格后,由机电人员共同进行调试。测试的目的是确认设备是否安装成功,与电控系统的连接是否正确,机电设备的性能和经济技术指标是否符合合同要求。
After the installation of all equipment of the dump cement mixer truck is completed, the electrical control system shall be connected, and the commissioning shall be carried out jointly by the electromechanical personnel after being accepted by the relevant personnel of the owner and the supplier. The purpose of the test is to confirm whether the equipment is successfully installed, whether the connection with the electric control system is correct, and whether the performance and economic and technical indicators of electromechanical equipment meet the requirements of the contract.
另外,在称重斗上焊接时,必须断开控制电源,将传感器短路或将焊机的地线直接放在称重斗上,以免电流过大造成焊接损坏在此过程中通过传感器。寮式传感器(S型)安装好后,需要拧紧锁紧螺母,悬吊螺钉不能堵住传感器槽,即悬吊螺钉与传感器之间应有10mm左右的间隙槽。
In addition, when welding on the weighing bucket, you must disconnect the control power supply, short circuit the sensor or place the ground wire of the welding machine directly on the weighing bucket to avoid welding damage caused by excessive current. In this process, you must pass through the sensor. There should be a 10mm gap between the left and right suspension screws of the sensor, i.e. the S-shaped screws should not be tightened to block the installation of the sensor.
自上料水泥搅拌车计量系统的维护事项便是这样了,你可以关注我们的网站www.sdzkjf.cn进行咨询!
This is the maintenance of the metering system of the loading cement mixer. You can pay attention to our website www.sdzkjf.com Cn for consultation!