您好,欢迎光临莱州聚峰机械有限公司网站! 郑重声明 进入官网

搅拌车发动机的磨合方式

来源:http://www.sdzkjf.cn/ 日期:2021-11-04 发布人:admin
冷磨合
Cold running in
冷磨合可以分成无压缩磨合和压缩磨合两个步骤,无压缩冷磨合时,要拆下喷油器;压缩冷磨合时则需要装上喷油器或者控制减压结构。
Cold running in can be divided into two steps: non compression running in and compression running in. When non compression cold running in, remove the fuel injector; During compression cold running in, an injector or a pressure reducing structure shall be installed.
冷磨合时,要以外力带动发动机运转,整个过程不能有柴油供给,而且要随时观察机油压力,检查气门室内有没有润滑油流动,同时水温要控制在40℃,注意各部位有没有异常响声,如果有的话,要立即停机检查,排除故障。冷磨合后要放出磨合油,清洗整个的润滑油管路系统。
During cold running in, the engine shall be driven by external force. There shall be no diesel supply in the whole process. In addition, the oil pressure shall be observed at any time to check whether there is lubricating oil flow in the valve chamber. At the same time, the water temperature shall be controlled at 40 ℃, and pay attention to whether there is abnormal noise in various parts. If there is any, stop the machine immediately for inspection and troubleshooting. After cold running in, drain the running in oil and clean the whole lubricating oil pipeline system.
自动搅拌车
无负荷热磨合
No load thermal running in
向混凝土搅拌车发动机油底壳加入足量的清洁磨合油,检查调整气门间隙和供油提前角,排出燃油系统中的空气,然后启动发动机,在冷却系统水温达到40℃以上时,提高发动机转速,并随时注意发动机各缸的运转情况。
Add enough clean running in oil to the engine oil pan of the concrete mixer truck, check and adjust the valve clearance and oil supply advance angle, discharge the air in the fuel system, then start the engine, increase the engine speed when the water temperature of the cooling system reaches more than 40 ℃, and pay attention to the operation of each cylinder of the engine at any time.
负荷热磨合
Load thermal running in
稳定发动机转速,慢慢增加负荷,持续运转一个半小时,检查各部位是否有漏油、漏水、漏气等现象,水温、油压是否正常,搅拌车发动机是否有异响或者异常。如果有及时熄火进行排查。发动机热磨合完毕后,应再次检查调整气门间隙,待发动机温度降低后,按规定力矩紧固气缸盖螺母。
Stabilize the engine speed, slowly increase the load, operate continuously for one and a half hours, check whether there is oil leakage, water leakage, air leakage and other phenomena at all parts, whether the water temperature and oil pressure are normal, and whether the mixer engine has abnormal noise or abnormality. If there is, shut down the engine in time for troubleshooting. After the hot running in of the engine, check and adjust the valve clearance again. After the engine temperature decreases, tighten the cylinder head nut according to the specified torque.
优化调整
Optimization and adjustment
保证柴油机正确的配气相位,定期检查气门间隙,测量时要注意顺着摇臂方向插入厚薄规,只有正确调整气门间隙才能使气缸内限度的充满新鲜空气、排出废气,并且减少气门积碳。
Ensure the correct valve timing of the diesel engine, regularly check the valve clearance, and pay attention to inserting a thickness gauge along the rocker arm during measurement. Only by correctly adjusting the valve clearance can the cylinder be filled with fresh air, exhaust gas and reduce valve carbon deposition.
磨合期对于确保车辆运转状态,延长车辆使用寿命,排除故障隐患是非常重要的一个时期,尤其是负荷很大的混凝土搅拌车,如果在磨合期内直接进行正常作业,很容易导致车辆各组件因为磨合不到位而出现各种故障,影响车辆的运转,所以在磨合期内一定不要满负荷运作,避免车辆受损。
The running in period is a very important period for ensuring the running in state of the vehicle, prolonging the service life of the vehicle and eliminating hidden troubles. In particular, if the concrete mixer with large load is operated normally directly during the running in period, it is easy to cause various faults of various components of the vehicle due to inadequate running in, affecting the operation of the vehicle, Therefore, do not operate at full load during the running in period to avoid damage to the vehicle.
本文的内容是由自动搅拌车给您提供,我们专注客户需求,不断的发展,为客户提供更多的服务,详情可参考我们的网站:http://www.sdzkjf.cn
The content of this article is provided to you by the automatic mixer. We focus on customer needs, continue to develop and provide customers with more services. For details, please refer to our website: http://www.sdzkjf.cn

上一篇:搅拌车燃油系统保养需要注意什么?
下一篇:水泥搅拌车干燥罐到底多久更换一次?